Renewable sitesBulwell Energy

Bulwell Energy

Bulwell Energy is under construction in Nottingham with a recorded capacity of 29.5 MW.

29.5 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Advanced Conversion Technologies
Technology
Chinook Sciences
Nottingham
Authority
England

Planning and build timeline

Application submitted2014-04-11
Permission granted2014-07-02
3 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Long Lane Solar Farm / Nottingham Brick Works
Solar Photovoltaics · Under Construction
171.5 km
Newthorpe Wind Turbine
Wind Onshore · Operational
2.55.8 km
Dorket Head
Landfill Gas · Operational
2.86.8 km
Burntstump Landfill Scheme
Landfill Gas · Operational
1.86.8 km
Newstead and Annesley Wind Turbine
Wind Onshore · Operational
1.57.2 km
Manners Avenue - Solar Panels
Solar Photovoltaics · Operational
0.628.1 km
Willow Road - Roof mounted solar panels
Solar Photovoltaics · Operational
0.358.2 km
Crompton Road, Ilkeston - Anaerobic Digestion Plant
Anaerobic Digestion · Operational
8.5 km

How big is Bulwell Energy?

Bulwell Energy has a recorded installed capacity of 29.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Bulwell Energy?

REPD records the operator as Chinook Sciences. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Bulwell Energy approved and built?

The application was submitted on 2014-04-11. Permission was granted on 2014-07-02, 3 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5982.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council