Marchwood ERF is an operational 16 MW energy-from-waste plant in New Forest, generating since 1 December 2004. Planning permission was granted on 1 December 2000, 5 months after submission. Operator of record: Veolia.

16 MW
Capacity
as recorded in REPD
Operational
Status
since 1 December 2004
EfW Incineration
Technology
Veolia
New Forest
Authority
England

Planning and build timeline

Application submitted1 July 2000
Permission granted1 December 2000
5 months after submission
Operational1 December 2004
48 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in New Forest: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Marchwood ERF’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
5.30.5 km
Solar Photovoltaics · Operational
1.94.9 km
Battery · Under Construction
205.4 km
Solar Photovoltaics · Operational
117.5 km
Solar Photovoltaics · Operational
57.5 km
EfW Incineration · Operational
8.67.7 km
Landfill Gas · Operational
1.28.4 km
Solar Photovoltaics · Operational
128.7 km

How big is Marchwood ERF?

Marchwood ERF has a recorded installed capacity of 16 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Marchwood ERF?

REPD records the operator as Veolia. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Marchwood ERF approved and built?

The application was submitted on 1 July 2000. Permission was granted on 1 December 2000, 5 months later. The site became operational on 1 December 2004, 48 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 835.