Marchwood ERF

Marchwood ERF is operational in New Forest with a recorded capacity of 16 MW, and has been generating since 2004-12-01.

16 MW
Capacity
as recorded in REPD
Operational
Status
since 2004-12-01
EfW Incineration
Technology
Veolia
New Forest
Authority
England

Planning and build timeline

Application submitted2000-07-01
Permission granted2000-12-01
5 months after submission
Operational2004-12-01
48 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Tavells Lane Solar Farm
Solar Photovoltaics · Operational
5.30.5 km
Testwood Water Supply Works
Solar Photovoltaics · Operational
1.94.9 km
Mill Lane, Nursling - Battery Storage Facility
Battery · Under Construction
205.4 km
Grove Solar Park (Phase 1)
Solar Photovoltaics · Operational
57.5 km
Grove Solar Park (Phase 2)
Solar Photovoltaics · Operational
117.5 km
Fawley Waste to Energy Plant
EfW Incineration · Operational
8.67.7 km
Netley Landfill Site, Hampshire (Extension)
Landfill Gas · Operational
1.28.4 km
Netley Landfill Solar
Solar Photovoltaics · Operational
128.7 km

How big is Marchwood ERF?

Marchwood ERF has a recorded installed capacity of 16 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Marchwood ERF?

REPD records the operator as Veolia. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Marchwood ERF approved and built?

The application was submitted on 2000-07-01. Permission was granted on 2000-12-01, 5 months later. The site became operational on 2004-12-01, 48 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 835.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council