Fawley Waste to Energy Plant is an operational 8.6 MW energy-from-waste plant in New Forest, generating since 1 June 2001. Planning permission was granted on 1 February 2001, 3 months after submission. Operator of record: Tradebe.
Planning and build timeline
| Application submitted | 31 October 2000 |
| Permission granted | 1 February 2001 3 months after submission |
| Operational | 1 June 2001 4 months after consent |
Screening a site of your own?
Redline runs the record on your own boundary in New Forest: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Fawley Waste to Energy Plant’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
- Nutrient-neutrality catchment — Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 3 | 4.6 km |
Solar Photovoltaics · Operational | 5 | 5 km |
Landfill Gas · Operational | 1.2 | 5.4 km |
Solar Photovoltaics · Operational | 12 | 5.7 km |
Solar Photovoltaics · Operational | 5.3 | 7.5 km |
EfW Incineration · Operational | 16 | 7.7 km |
Solar Photovoltaics · Under Construction | 1.04 | 9.6 km |
Battery · Under Construction | 49 | 12.2 km |
How big is Fawley Waste to Energy Plant?
Fawley Waste to Energy Plant has a recorded installed capacity of 8.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Fawley Waste to Energy Plant?
REPD records the operator as Tradebe. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Fawley Waste to Energy Plant approved and built?
The application was submitted on 31 October 2000. Permission was granted on 1 February 2001, 3 months later. The site became operational on 1 June 2001, 4 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1015.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode