Fawley Waste to Energy Plant is operational in New Forest with a recorded capacity of 8.6 MW, and has been generating since 2001-06-01.

8.6 MW
Capacity
as recorded in REPD
Operational
Status
since 2001-06-01
EfW Incineration
Technology
Tradebe
New Forest
Authority
England

Planning and build timeline

Application submitted2000-10-31
Permission granted2001-02-01
3 months after submission
Operational2001-06-01
4 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
The Manor of Cadland Estate - extension
Solar Photovoltaics · Operational
34.6 km
The Manor of Cadland Estate
Solar Photovoltaics · Operational
55 km
Netley Landfill Site, Hampshire (Extension)
Landfill Gas · Operational
1.25.4 km
Netley Landfill Solar
Solar Photovoltaics · Operational
125.7 km
Tavells Lane Solar Farm
Solar Photovoltaics · Operational
5.37.5 km
Marchwood ERF
EfW Incineration · Operational
167.7 km
Concorde Way, Segensworth - Solar Panels
Solar Photovoltaics · Under Construction
1.049.6 km
Titchfield Lane
Battery · Under Construction
4912.2 km

How big is Fawley Waste to Energy Plant?

Fawley Waste to Energy Plant has a recorded installed capacity of 8.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Fawley Waste to Energy Plant?

REPD records the operator as Tradebe. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Fawley Waste to Energy Plant approved and built?

The application was submitted on 2000-10-31. Permission was granted on 2001-02-01, 3 months later. The site became operational on 2001-06-01, 4 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1015.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council