Novarly ParcelRenewable sites

Renewable sitesMilton Landfill Site

Milton Landfill Site

Milton Landfill Site is an operational 2 MW landfill gas site in South Cambridgeshire, generating since 1 July 1993. REPD does not record the planning grant date. Operator of record: Waste Recycling Group.

2 MW
Capacity
as recorded in REPD
Operational
Status
since 1 July 1993
Landfill Gas
Technology
Waste Recycling Group
South Cambridgeshire
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational1 July 1993

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in South Cambridgeshire: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Milton Landfill Site’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
1.16.6 km
Solar Photovoltaics · Operational
6.39.3 km
Solar Photovoltaics · Operational
59.7 km
Solar Photovoltaics · Operational
59.7 km
Solar Photovoltaics · Operational
38.110 km
Solar Photovoltaics · Operational
19.310.5 km
Solar Photovoltaics · Operational
2410.7 km
Solar Photovoltaics · Operational
1011.1 km

How big is Milton Landfill Site?

Milton Landfill Site has a recorded installed capacity of 2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Milton Landfill Site?

REPD records the operator as Waste Recycling Group. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Milton Landfill Site approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 1 July 1993.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 672.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode