Stowbridge Farm

Stowbridge Farm is operational in East Cambridgeshire with a recorded capacity of 24 MW, and has been generating since 2014-03-28.

24 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-03-28
Solar Photovoltaics
Technology
Magnetar Solar
East Cambridgeshire
Authority
England

Planning and build timeline

Application submitted2012-09-24
Permission granted2012-12-10
3 months after submission
Operational2014-03-28
16 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

East Cambridgeshire’s record on solar

East Cambridgeshire has decided 21 solar farms and approved 100%, taking a median of 3.4 months. See every solar farm decision in East Cambridgeshire

Other built sites within 15 km

SiteMWDistance
Stowbridge Farm - Extension (Phase 1)
Solar Photovoltaics · Operational
100.6 km
Stowbridge Farm - Extension (Phase 2)
Solar Photovoltaics · Operational
100.7 km
Chittering Solar Farm
Solar Photovoltaics · Operational
51.2 km
Chittering Solar Farm Extension
Solar Photovoltaics · Operational
6.31.5 km
Mingay Farm
Solar Photovoltaics · Operational
54 km
Mingay Farm - extension
Solar Photovoltaics · Operational
19.34.2 km
Ely Road Waste Management Park
Solar Photovoltaics · Operational
1.14.3 km
North Angle Farm
Solar Photovoltaics · Under Construction
29.46.7 km

How big is Stowbridge Farm?

Stowbridge Farm has a recorded installed capacity of 24 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Stowbridge Farm?

REPD records the operator as Magnetar Solar. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Stowbridge Farm approved and built?

The application was submitted on 2012-09-24. Permission was granted on 2012-12-10, 3 months later. The site became operational on 2014-03-28, 16 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2065.