Stowbridge Farm - Extension (Phase 1) is an operational 10 MW solar farm in East Cambridgeshire, generating since 20 March 2015. Planning permission was granted on 6 March 2014, 7 months after submission. Operator of record: FC Palmer & Sons Ltd.

10 MW
Capacity
as recorded in REPD
Operational
Status
since 20 March 2015
Solar Photovoltaics
Technology
FC Palmer & Sons Ltd
East Cambridgeshire
Authority
England

Planning and build timeline

Application submitted20 August 2013
Permission granted6 March 2014
7 months after submission
Operational20 March 2015
12 months after consent

Screening a site of your own?

RedlineUK · £39

East Cambridgeshire approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Stowbridge Farm - Extension (Phase 1)’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 1 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

East Cambridgeshire’s record on solar

East Cambridgeshire has decided 21 solar farms and approved 100%, taking a median of 3.4 months. See every solar farm decision in East Cambridgeshire

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
100.3 km
Solar Photovoltaics · Operational
240.6 km
Solar Photovoltaics · Operational
51.5 km
Solar Photovoltaics · Operational
6.31.8 km
Solar Photovoltaics · Operational
54.3 km
Solar Photovoltaics · Operational
19.34.7 km
Solar Photovoltaics · Operational
1.14.8 km
Solar Photovoltaics · Under Construction
29.46.2 km

How big is Stowbridge Farm - Extension (Phase 1)?

Stowbridge Farm - Extension (Phase 1) has a recorded installed capacity of 10 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Stowbridge Farm - Extension (Phase 1)?

REPD records the operator as FC Palmer & Sons Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Stowbridge Farm - Extension (Phase 1) approved and built?

The application was submitted on 20 August 2013. Permission was granted on 6 March 2014, 7 months later. The site became operational on 20 March 2015, 12 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2360.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode