Renewable sites › Stowbridge Farm - Extension (Phase 1)
Stowbridge Farm - Extension (Phase 1)
Stowbridge Farm - Extension (Phase 1) is operational in East Cambridgeshire with a recorded capacity of 10 MW, and has been generating since 2015-03-20.
Planning and build timeline
| Application submitted | 2013-08-20 |
| Permission granted | 2014-03-06 7 months after submission |
| Operational | 2015-03-20 12 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 1 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
East Cambridgeshire’s record on solar
East Cambridgeshire has decided 21 solar farms and approved 100%, taking a median of 3.4 months. See every solar farm decision in East Cambridgeshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Stowbridge Farm - Extension (Phase 2) Solar Photovoltaics · Operational | 10 | 0.3 km |
Stowbridge Farm Solar Photovoltaics · Operational | 24 | 0.6 km |
Chittering Solar Farm Solar Photovoltaics · Operational | 5 | 1.5 km |
Chittering Solar Farm Extension Solar Photovoltaics · Operational | 6.3 | 1.8 km |
Mingay Farm Solar Photovoltaics · Operational | 5 | 4.3 km |
Mingay Farm - extension Solar Photovoltaics · Operational | 19.3 | 4.7 km |
Ely Road Waste Management Park Solar Photovoltaics · Operational | 1.1 | 4.8 km |
North Angle Farm Solar Photovoltaics · Under Construction | 29.4 | 6.2 km |
How big is Stowbridge Farm - Extension (Phase 1)?
Stowbridge Farm - Extension (Phase 1) has a recorded installed capacity of 10 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Stowbridge Farm - Extension (Phase 1)?
REPD records the operator as FC Palmer & Sons Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Stowbridge Farm - Extension (Phase 1) approved and built?
The application was submitted on 2013-08-20. Permission was granted on 2014-03-06, 7 months later. The site became operational on 2015-03-20, 12 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2360.