Novarly ParcelRenewable sites

Renewable sitesGreat Wilbraham Solar Farm

Great Wilbraham Solar Farm

Great Wilbraham Solar Farm is operational in South Cambridgeshire with a recorded capacity of 38.1 MW, and has been generating since 2015-03-31.

38.1 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-03-31
Solar Photovoltaics
Technology
Inazin Energy Limited / Low Carbon
South Cambridgeshire
Authority
England

Planning and build timeline

Application submitted2014-01-14
Permission granted2014-07-28
6 months after submission
Operational2015-03-31
8 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

South Cambridgeshire’s record on solar

South Cambridgeshire has decided 41 solar farms and approved 88%, taking a median of 3.9 months. See every solar farm decision in South Cambridgeshire

Other built sites within 15 km

SiteMWDistance
Wadlow Wind Farm
Wind Onshore · Operational
263.8 km
Exning
Solar Photovoltaics · Operational
29.99.1 km
Milton Landfill Site
Landfill Gas · Operational
210 km
Burwell - Battery Storage
Battery · Operational
5010.9 km
Burwell Solar Farm
Solar Photovoltaics · Under Construction
49.911.3 km
Goosehall Solar Farm
Solar Photovoltaics · Operational
39.512.4 km
Breach Farm - Solar farm
Battery · Operational
0.6613.1 km
Breach Farm - Solar farm
Solar Photovoltaics · Operational
49.913.1 km

How big is Great Wilbraham Solar Farm?

Great Wilbraham Solar Farm has a recorded installed capacity of 38.1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Great Wilbraham Solar Farm?

REPD records the operator as Inazin Energy Limited / Low Carbon. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Great Wilbraham Solar Farm approved and built?

The application was submitted on 2014-01-14. Permission was granted on 2014-07-28, 6 months later. The site became operational on 2015-03-31, 8 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1835.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council