Renewable sitesMingay Farm - extension

Mingay Farm - extension

Mingay Farm - extension is operational in East Cambridgeshire with a recorded capacity of 19.3 MW, and has been generating since 2014-03-31.

19.3 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-03-31
Solar Photovoltaics
Technology
Octopus Imvetments
East Cambridgeshire
Authority
England

Planning and build timeline

Application submitted2013-07-11
Permission granted2013-10-30
4 months after submission
Operational2014-03-31
5 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 1 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

East Cambridgeshire’s record on solar

East Cambridgeshire has decided 21 solar farms and approved 100%, taking a median of 3.4 months. See every solar farm decision in East Cambridgeshire

Other built sites within 15 km

SiteMWDistance
Mingay Farm
Solar Photovoltaics · Operational
51.3 km
Stowbridge Farm
Solar Photovoltaics · Operational
244.2 km
Ely Road Waste Management Park
Solar Photovoltaics · Operational
1.14.4 km
Stowbridge Farm - Extension (Phase 2)
Solar Photovoltaics · Operational
104.7 km
Chittering Solar Farm Extension
Solar Photovoltaics · Operational
6.34.7 km
Stowbridge Farm - Extension (Phase 1)
Solar Photovoltaics · Operational
104.7 km
Chittering Solar Farm
Solar Photovoltaics · Operational
54.8 km
Elean Business Park Biomass Plant
Biomass (dedicated) · Operational
407.2 km

How big is Mingay Farm - extension?

Mingay Farm - extension has a recorded installed capacity of 19.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Mingay Farm - extension?

REPD records the operator as Octopus Imvetments. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Mingay Farm - extension approved and built?

The application was submitted on 2013-07-11. Permission was granted on 2013-10-30, 4 months later. The site became operational on 2014-03-31, 5 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1502.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council