Renewable sitesMetrocentre Green Car Park, St Michaels Way - Photovoltaic Equipment

Metrocentre Green Car Park, St Michaels Way - Photovoltaic Equipment

Metrocentre Green Car Park, St Michaels Way - Photovoltaic Equipment is a solar farm under construction in Gateshead. Planning permission was granted on 9 January 2023, 13 months after submission. Operator of record: The Metrocentre Partnership.

Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
The Metrocentre Partnership
Gateshead
Authority
England

Planning and build timeline

Application submitted7 December 2021
Permission granted9 January 2023
13 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Gateshead approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Metrocentre Green Car Park, St Michaels Way - Photovoltaic Equipment’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Gateshead’s record on solar

Gateshead has decided 20 solar farms and approved 100%, taking a median of 1.8 months. See every solar farm decision in Gateshead

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Under Construction
0.532.7 km
Landfill Gas · Operational
14 km
Solar Photovoltaics · Operational
4.2 km
Landfill Gas · Operational
1.55.8 km
Landfill Gas · Operational
3.85.8 km
Landfill Gas · Operational
2.37.1 km
Landfill Gas · Operational
28.7 km
Landfill Gas · Operational
28.8 km

How big is Metrocentre Green Car Park, St Michaels Way - Photovoltaic Equipment?

REPD does not record an installed capacity for Metrocentre Green Car Park, St Michaels Way - Photovoltaic Equipment.

Who operates Metrocentre Green Car Park, St Michaels Way - Photovoltaic Equipment?

REPD records the operator as The Metrocentre Partnership. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Metrocentre Green Car Park, St Michaels Way - Photovoltaic Equipment approved and built?

The application was submitted on 7 December 2021. Permission was granted on 9 January 2023, 13 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 12075.