Fiskerton Airfield (Phase 1)
Fiskerton Airfield (Phase 1) is operational in West Lindsey with a recorded capacity of 12 MW, and has been generating since 2015-03-31.
Planning and build timeline
| Application submitted | 2013-11-07 |
| Permission granted | 2014-01-30 3 months after submission |
| Operational | 2015-03-31 14 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
West Lindsey’s record on solar
West Lindsey has decided 21 solar farms and approved 86%, taking a median of 1.9 months. See every solar farm decision in West Lindsey →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Fiskerton Airfield (Phase 2) Solar Photovoltaics · Operational | 22 | 0 km |
Top Farm, Short Ferry Road - Solar PV Arrays Solar Photovoltaics · Under Construction | 0.86 | 5.5 km |
Branston Solar Park (extension) Solar Photovoltaics · Under Construction | 40 | 7.1 km |
Branston solar park Solar Photovoltaics · Operational | 18.9 | 7.6 km |
Leverton Farm - Energy Barn Battery · Operational | 10 | 9.2 km |
Primrose Hill Farm Solar Photovoltaics · Operational | 3.7 | 9.6 km |
Land at Grange Farm Anaerobic Digestion · Operational | 1.1 | 12.5 km |
Metheringham Heath (Farm AD) Anaerobic Digestion · Operational | 6.5 | 12.6 km |
How big is Fiskerton Airfield (Phase 1)?
Fiskerton Airfield (Phase 1) has a recorded installed capacity of 12 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Fiskerton Airfield (Phase 1)?
REPD records the operator as NESF (formerly Lark Energy). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Fiskerton Airfield (Phase 1) approved and built?
The application was submitted on 2013-11-07. Permission was granted on 2014-01-30, 3 months later. The site became operational on 2015-03-31, 14 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2369.