Novarly ParcelRenewable planning

Renewable planning Battery storageTewkesbury

Battery storage planning in Tewkesbury

Tewkesbury has decided 5 battery storage schemes and approved 100% of them, taking a median of 7.4 months to decide. Consented capacity: 211 MW. 2 applications still awaiting a decision.

100%
Approved
5 granted · 0 refused
7.4 mo
Median decision
UK 6 mo
211 MW
Consented
across approved schemes
0
Appeals
no appeals recorded

⚠️ Small caseload (5 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How Tewkesbury compares

Against the 137 UK authorities with 5+ battery storage decisions, Tewkesbury sits in the 73rd percentile for approval rate (8 points above the England average) and the 28th percentile for speed.

Decisions by year

35Approved — 1 (2021)121Approved — 1 (2023)123Approved — 2 (2024)224
Approved Refused

Battery storage decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (8)

SchemeMWStatusDecided
Lassington Lane, Highnam - Battery Storage
Pathfinder Clean Energy UK Dev Limited · 25/00566/FUL
10Application Submitted2025-07-11
Tredington House Farm, Tredington - Battery Energy Storage Facility
Greenfield Energy Developments Ltd · 24/00411/FUL · 6.8 mo to decide
40Awaiting Construction2024-12-10
Brockworth Road - Battery Storage System
Exagen · 23/01078/FUL · 5 mo to decide
20Awaiting Construction2024-04-25
Linton Court Farm, Highnam - Battery storage
STOR 136 Limited · 22/01374/FUL · 8 mo to decide
99.9Awaiting Construction2023-08-21
Bengrove Farm, Base Lane - Battery Storage
Bengrove Bess Limited · 22/01231/FUL
49.9Application Submitted2022-11-15
Claydon Farm - Solar Farm & Battery Storage
JBM Solar Projects 17 Limited · 21/00259/FUL · 10.8 mo to decide
49.9Awaiting Construction2021-12-17
Meteor Business Park
Safran Landing Systems · 19/00093/FUL
1.5Operational2019-02-21
Northway Lane Waste Transfer Station
Aura Power · 17/00117/FUL
7Abandoned2017-01-31

Does Tewkesbury approve battery storage schemes?

Yes — of the 5 battery storage schemes Tewkesbury has decided, 100% were approved (5 granted, 0 refused). The UK-wide rate for battery storage is 92%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a battery storage scheme application take in Tewkesbury?

The median time from application to decision is 7.4 months, against a UK median of 6 months for battery storage. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much battery storage capacity has Tewkesbury consented?

211 MW has been consented across 5 approved schemes. A further 2 applications awaits a decision.

Other technologies in Tewkesbury

Solar in TewkesburyOnshore wind in Tewkesbury

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.