Jamesfield Organic Centre - Battery Storage
Jamesfield Organic Centre - Battery Storage is an operational 49 MW battery storage site in Perth and Kinross, generating since 1 February 2024. Planning permission was granted on 28 September 2022, 4 months after submission. Operator of record: Harmony Energy Storage.
Planning and build timeline
| Application submitted | 20 May 2022 |
| Permission granted | 28 September 2022 4 months after submission |
| Operational | 1 February 2024 16 months after consent |
Screening a site of your own?
Perth and Kinross approves 88% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Jamesfield Organic Centre - Battery Storage’s recorded coordinate — swap in your own postcode or coordinates.
Perth and Kinross’s record on battery storage
Perth and Kinross has decided 16 battery storage schemes and approved 88%, taking a median of 4.4 months. See every battery storage scheme decision in Perth and Kinross →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 13 | 2.6 km |
Landfill Gas · Operational | 1.9 | 4.7 km |
Anaerobic Digestion · Operational | 1.5 | 4.9 km |
Wind Onshore · Operational | 10 | 5 km |
EfW Incineration · Under Construction | 7.3 | 5.8 km |
Solar Photovoltaics · Operational | 0.4 | 6.7 km |
Solar Photovoltaics · Operational | 0.3 | 6.8 km |
Battery · Operational | — | 6.8 km |
How big is Jamesfield Organic Centre - Battery Storage?
Jamesfield Organic Centre - Battery Storage has a recorded installed capacity of 49 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Jamesfield Organic Centre - Battery Storage?
REPD records the operator as Harmony Energy Storage. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Jamesfield Organic Centre - Battery Storage approved and built?
The application was submitted on 20 May 2022. Permission was granted on 28 September 2022, 4 months later. The site became operational on 1 February 2024, 16 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 10863.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode