Novarly ParcelRenewable sites

Renewable sitesLower Coombe Farm Solar

Lower Coombe Farm Solar

Lower Coombe Farm Solar is an operational 1 MW solar farm in Somerset, generating since 24 June 2011. Planning permission was granted on 25 January 2011, 2 months after submission. Operator of record: Solar South West.

1 MW
Capacity
as recorded in REPD
Operational
Status
since 24 June 2011
Solar Photovoltaics
Technology
Solar South West
Somerset
Authority
England

Planning and build timeline

Application submitted19 November 2010
Permission granted25 January 2011
2 months after submission
Operational24 June 2011
5 months after consent

Screening a site of your own?

RedlineUK · £39

Somerset approves 86% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Lower Coombe Farm Solar’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Somerset’s record on solar

Somerset has decided 147 solar farms and approved 86%, taking a median of 3 months. See every solar farm decision in Somerset

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
10.5 km
Solar Photovoltaics · Operational
10.84.1 km
Solar Photovoltaics · Operational
25.4 km
Solar Photovoltaics · Under Construction
2.15.4 km
Solar Photovoltaics · Operational
106.3 km
Solar Photovoltaics · Operational
7.67.5 km
Solar Photovoltaics · Operational
37.9 km
Battery · Operational
8.88.8 km

How big is Lower Coombe Farm Solar?

Lower Coombe Farm Solar has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Lower Coombe Farm Solar?

REPD records the operator as Solar South West. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Lower Coombe Farm Solar approved and built?

The application was submitted on 19 November 2010. Permission was granted on 25 January 2011, 2 months later. The site became operational on 24 June 2011, 5 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1081.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode