JB Wheaton is operational in Somerset with a recorded capacity of 8.8 MW, and has been generating since 2016-08-08.

8.8 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-08-08
Battery
Technology
E.ON UK
Somerset
Authority
England

Planning and build timeline

Application submitted2014-09-29
Permission grantednot recorded
Operational2016-08-08

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Somerset’s record on battery storage

Somerset has decided 23 battery storage schemes and approved 100%, taking a median of 7.2 months. See every battery storage scheme decision in Somerset

Other built sites within 15 km

SiteMWDistance
Marshwood Farm
Solar Photovoltaics · Operational
1.80.2 km
Axe View Solar Farm
Solar Photovoltaics · Operational
53.7 km
Goldenhaye Field Solar Farm
Solar Photovoltaics · Operational
24.2 km
Chard Solar Park
Solar Photovoltaics · Operational
35 km
Wambrook Farm
Solar Photovoltaics · Operational
4.15.2 km
Beechgrove Farm
Solar Photovoltaics · Operational
45.7 km
Stonebarrow Farm
Solar Photovoltaics · Operational
86.2 km
Wyld Meadow Solar Farm
Solar Photovoltaics · Operational
4.86.9 km

How big is JB Wheaton?

JB Wheaton has a recorded installed capacity of 8.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates JB Wheaton?

REPD records the operator as E.ON UK. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was JB Wheaton approved and built?

The application was submitted on 2014-09-29. REPD does not record a grant date. The site became operational on 2016-08-08.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6897.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council