Cleave Farm Solar Park

Cleave Farm Solar Park is operational in Torridge with a recorded capacity of 4.7 MW, and has been generating since 2013-10-25.

4.7 MW
Capacity
as recorded in REPD
Operational
Status
since 2013-10-25
Solar Photovoltaics
Technology
Lightsource Renewable Energy
Torridge
Authority
England

Planning and build timeline

Application submitted2012-11-19
Permission granted2013-02-18
3 months after submission
Operational2013-10-25
8 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Torridge’s record on solar

Torridge has decided 28 solar farms and approved 96%, taking a median of 3.6 months. See every solar farm decision in Torridge

Other built sites within 15 km

SiteMWDistance
Gammaton Moor Solar farm
Solar Photovoltaics · Under Construction
320.3 km
Knockworthy Farm
Solar Photovoltaics · Operational
3.52.4 km
Chubb Road - Solar Photovoltaic
Solar Photovoltaics · Operational
0.153.7 km
Darracott Moor
Wind Onshore · Operational
2.63.9 km
Deep Moor Gas to Energy
Landfill Gas · Operational
24.6 km
Litchardon Cross Solar Farm
Solar Photovoltaics · Operational
49.94.8 km
Deep Moor Landfill Site
Solar Photovoltaics · Operational
25.1 km
Collacott Farm
Solar Photovoltaics · Operational
4.55.6 km

How big is Cleave Farm Solar Park?

Cleave Farm Solar Park has a recorded installed capacity of 4.7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Cleave Farm Solar Park?

REPD records the operator as Lightsource Renewable Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Cleave Farm Solar Park approved and built?

The application was submitted on 2012-11-19. Permission was granted on 2013-02-18, 3 months later. The site became operational on 2013-10-25, 8 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1649.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council