Renewable sites › Limebury Farm, Horns Cross - Solar Farm
Limebury Farm, Horns Cross - Solar Farm
Limebury Farm, Horns Cross - Solar Farm is under construction in Torridge with a recorded capacity of 6.5 MW.
Planning and build timeline
| Application submitted | 2022-10-28 |
| Permission granted | 2023-05-10 6 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Torridge’s record on solar
Torridge has decided 28 solar farms and approved 96%, taking a median of 3.6 months. See every solar farm decision in Torridge →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Walland Farm Solar Photovoltaics · Operational | 5 | 1.1 km |
Galsworthy Wind Park Wind Onshore · Operational | 9.2 | 7.6 km |
East Youlstone Wind Farm Wind Onshore · Operational | 4 | 10.4 km |
Chubb Road - Solar Photovoltaic Solar Photovoltaics · Operational | 0.15 | 10.5 km |
Chester Energy (East Woolley Farm) Solar Photovoltaics · Operational | 5 | 12.3 km |
Southcombe Farm Solar Photovoltaics · Operational | 1.2 | 12.9 km |
Crimp Wind Farm Wind Onshore · Operational | 2.4 | 13.1 km |
East Langford Farm Solar Photovoltaics · Operational | 5 | 13.5 km |
How big is Limebury Farm, Horns Cross - Solar Farm?
Limebury Farm, Horns Cross - Solar Farm has a recorded installed capacity of 6.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Limebury Farm, Horns Cross - Solar Farm?
REPD records the operator as Green Switch Capital Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Limebury Farm, Horns Cross - Solar Farm approved and built?
The application was submitted on 2022-10-28. Permission was granted on 2023-05-10, 6 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 12972.
Novarly Parcel · official public data, read properly · parcel.novarly.com