Renewable sites › Chubb Road - Solar Photovoltaic
Chubb Road - Solar Photovoltaic
Chubb Road - Solar Photovoltaic is operational in Torridge with a recorded capacity of 0.15 MW, and has been generating since 2022-05-01.
Planning and build timeline
| Application submitted | 2022-01-04 |
| Permission granted | 2022-04-29 4 months after submission |
| Operational | 2022-05-01 0 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Torridge’s record on solar
Torridge has decided 28 solar farms and approved 96%, taking a median of 3.6 months. See every solar farm decision in Torridge →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Gammaton Moor Solar farm Solar Photovoltaics · Under Construction | 32 | 3.7 km |
Cleave Farm Solar Park Solar Photovoltaics · Operational | 4.7 | 3.7 km |
Knockworthy Farm Solar Photovoltaics · Operational | 3.5 | 5.7 km |
Litchardon Cross Solar Farm Solar Photovoltaics · Operational | 49.9 | 6.3 km |
Collacott Farm Solar Photovoltaics · Operational | 4.5 | 6.7 km |
Darracott Moor Wind Onshore · Operational | 2.6 | 6.8 km |
Deep Moor Gas to Energy Landfill Gas · Operational | 2 | 7.9 km |
Horsacott Farm Solar Park Solar Photovoltaics · Operational | 6.4 | 8.3 km |
How big is Chubb Road - Solar Photovoltaic?
Chubb Road - Solar Photovoltaic has a recorded installed capacity of 0.15 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Chubb Road - Solar Photovoltaic?
REPD records the operator as Advanced Pallet Systems. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Chubb Road - Solar Photovoltaic approved and built?
The application was submitted on 2022-01-04. Permission was granted on 2022-04-29, 4 months later. The site became operational on 2022-05-01, 0 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 10412.
Novarly Parcel · official public data, read properly · parcel.novarly.com