Novarly ParcelRenewable sites

Renewable sitesLimberlost Solar Farm

Limberlost Solar Farm

Limberlost Solar Farm is operational in West Berkshire with a recorded capacity of 0.3 MW, and has been generating since 2015-12-11.

0.3 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-12-11
Battery
Technology
Anesco
West Berkshire
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational2015-12-11

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

West Berkshire’s record on battery storage

West Berkshire has decided 6 battery storage schemes and approved 100%, taking a median of 3.1 months. See every battery storage scheme decision in West Berkshire

Other built sites within 15 km

SiteMWDistance
Limberlost Farm
Solar Photovoltaics · Operational
1.50 km
Gravel Works, Wasing Estate
Solar Photovoltaics · Operational
52.7 km
Berry Court Farm
Solar Photovoltaics · Operational
4.210.3 km
Berry Court Solar Farm - energy storage
Battery · Operational
110.5 km
Hill End Farm
Solar Photovoltaics · Operational
2.811.4 km
Minchens Lane Battery Storage Facility
Battery · Operational
10012.8 km
Pierces Farm
Solar Photovoltaics · Operational
1.714.8 km
Overton
Solar Photovoltaics · Operational
414.9 km

How big is Limberlost Solar Farm?

Limberlost Solar Farm has a recorded installed capacity of 0.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Limberlost Solar Farm?

REPD records the operator as Anesco. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Limberlost Solar Farm approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2015-12-11.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6879.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council