Levenmouth demonstration turbine (Fife Energy Park)
Levenmouth demonstration turbine (Fife Energy Park) is an operational 7 MW offshore wind farm in Scotland, generating since 31 March 2014. Planning permission was granted on 18 November 2011, 24 months after submission. Operator of record: Catapult.
Planning and build timeline
| Application submitted | 2 December 2009 |
| Permission granted | 18 November 2011 24 months after submission |
| Operational | 31 March 2014 28 months after consent |
Screening a site of your own?
Redline runs the same record on your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Levenmouth demonstration turbine (Fife Energy Park)’s recorded coordinate — swap in your own postcode or coordinates.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Hydrogen · Under Construction | — | 4.3 km |
Solar Photovoltaics · Under Construction | 4.19 | 6.1 km |
Biomass (dedicated) · Operational | 5.5 | 6.9 km |
Wind Onshore · Operational | 18.4 | 7.8 km |
Solar Photovoltaics · Operational | 5 | 11.8 km |
Solar Photovoltaics · Operational | 5 | 12 km |
Wind Onshore · Operational | 1.5 | 12.5 km |
Wind Onshore · Operational | 1.5 | 12.5 km |
How big is Levenmouth demonstration turbine (Fife Energy Park)?
Levenmouth demonstration turbine (Fife Energy Park) has a recorded installed capacity of 7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Levenmouth demonstration turbine (Fife Energy Park)?
REPD records the operator as Catapult. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Levenmouth demonstration turbine (Fife Energy Park) approved and built?
The application was submitted on 2 December 2009. Permission was granted on 18 November 2011, 24 months later. The site became operational on 31 March 2014, 28 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2528.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode