Fife Energy Park - H100 Fife Hydrogen Demonstration Project

Fife Energy Park - H100 Fife Hydrogen Demonstration Project is a hydrogen plant under construction in Fife. Planning permission was granted on 6 August 2021, 7 months after submission. Operator of record: Scottish Gas Networks.

Capacity
as recorded in REPD
Under Construction
Status
no operational date
Hydrogen
Technology
Scottish Gas Networks
Fife
Authority
Scotland

Planning and build timeline

Application submitted28 December 2020
Permission granted6 August 2021
7 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Fife: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Fife Energy Park - H100 Fife Hydrogen Demonstration Project’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Under Construction
4.192.2 km
Biomass (dedicated) · Operational
5.52.6 km
Wind Onshore · Operational
18.44 km
Wind Offshore · Operational
74.3 km
Solar Photovoltaics · Operational
58.4 km
Solar Photovoltaics · Operational
58.7 km
Wind Onshore · Operational
1.58.9 km
Wind Onshore · Operational
1.58.9 km

How big is Fife Energy Park - H100 Fife Hydrogen Demonstration Project?

REPD does not record an installed capacity for Fife Energy Park - H100 Fife Hydrogen Demonstration Project.

Who operates Fife Energy Park - H100 Fife Hydrogen Demonstration Project?

REPD records the operator as Scottish Gas Networks. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Fife Energy Park - H100 Fife Hydrogen Demonstration Project approved and built?

The application was submitted on 28 December 2020. Permission was granted on 6 August 2021, 7 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 10243.