Langley Moor
Langley Moor is operational in County Durham with a recorded capacity of 8 MW, and has been generating since 2008-08-13.
Planning and build timeline
| Application submitted | 2005-01-28 |
| Permission granted | 2005-06-30 5 months after submission |
| Operational | 2008-08-13 37 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 4 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
County Durham’s record on onshore wind
County Durham has decided 30 onshore wind schemes and approved 63%, taking a median of 10.5 months. See every onshore wind scheme decision in County Durham →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Holmside Hall Wind Onshore · Operational | 2.8 | 2.6 km |
Green Croft Solar Farm Solar Photovoltaics · Operational | 5 | 4.7 km |
Chapman's Well Landfill Gas · Operational | 1 | 4.8 km |
Greencroft Estate Turbines Wind Onshore · Operational | 4 | 5.5 km |
Hedley Hope Wind Onshore · Operational | 2.4 | 8.5 km |
High Hedley Hope 2 (Extension) Wind Onshore · Operational | 5.2 | 8.5 km |
Lumley Water Treatment Works - Solar Panels Solar Photovoltaics · Operational | 1.9 | 8.8 km |
PG4 St Bedes Power Generation (Extension) Landfill Gas · Operational | 2 | 9.3 km |
How big is Langley Moor?
Langley Moor has a recorded installed capacity of 8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Langley Moor?
REPD records the operator as EDF Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Langley Moor approved and built?
The application was submitted on 2005-01-28. Permission was granted on 2005-06-30, 5 months later. The site became operational on 2008-08-13, 37 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3248.