Greencroft Estate Turbines

Greencroft Estate Turbines is operational in County Durham with a recorded capacity of 4 MW, and has been generating since 2013-03-01.

4 MW
Capacity
as recorded in REPD
Operational
Status
since 2013-03-01
Wind Onshore
Technology
Lanchester Properties
County Durham
Authority
England

Planning and build timeline

Application submitted2011-06-28
Permission granted2011-11-01
4 months after submission
Operational2013-03-01
16 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

County Durham’s record on onshore wind

County Durham has decided 30 onshore wind schemes and approved 63%, taking a median of 10.5 months. See every onshore wind scheme decision in County Durham

Other built sites within 15 km

SiteMWDistance
Green Croft Solar Farm
Solar Photovoltaics · Operational
50.8 km
Chapman's Well
Landfill Gas · Operational
11.1 km
Land Adjacent to Thomas Swan and Co Ltd.
Anaerobic Digestion · Operational
14.3 km
Holmside Hall
Wind Onshore · Operational
2.84.6 km
Langley Moor
Wind Onshore · Operational
85.5 km
Hownsgill Industrial Park
Solar Photovoltaics · Under Construction
56.1 km
Derwentside Environmental Testing Servs Limited - Solar pv panels
Solar Photovoltaics · Operational
0.386.2 km
Hedley Hope
Wind Onshore · Operational
2.49.6 km

How big is Greencroft Estate Turbines?

Greencroft Estate Turbines has a recorded installed capacity of 4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Greencroft Estate Turbines?

REPD records the operator as Lanchester Properties. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Greencroft Estate Turbines approved and built?

The application was submitted on 2011-06-28. Permission was granted on 2011-11-01, 4 months later. The site became operational on 2013-03-01, 16 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3859.