Novarly ParcelRenewable sites

Renewable sitesChapman's Well

Chapman's Well

Chapman's Well is operational in County Durham with a recorded capacity of 1 MW, and has been generating since 2003-03-01.

1 MW
Capacity
as recorded in REPD
Operational
Status
since 2003-03-01
Landfill Gas
Technology
Natural Power
County Durham
Authority
England

Planning and build timeline

Application submitted2002-05-30
Permission granted2002-08-21
3 months after submission
Operational2003-03-01
6 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Green Croft Solar Farm
Solar Photovoltaics · Operational
50.6 km
Greencroft Estate Turbines
Wind Onshore · Operational
41.1 km
Holmside Hall
Wind Onshore · Operational
2.83.5 km
Langley Moor
Wind Onshore · Operational
84.8 km
Land Adjacent to Thomas Swan and Co Ltd.
Anaerobic Digestion · Operational
15.3 km
Hownsgill Industrial Park
Solar Photovoltaics · Under Construction
57.2 km
Derwentside Environmental Testing Servs Limited - Solar pv panels
Solar Photovoltaics · Operational
0.387.3 km
High Hedley Hope 2 (Extension)
Wind Onshore · Operational
5.29.9 km

How big is Chapman's Well?

Chapman's Well has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Chapman's Well?

REPD records the operator as Natural Power. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Chapman's Well approved and built?

The application was submitted on 2002-05-30. Permission was granted on 2002-08-21, 3 months later. The site became operational on 2003-03-01, 6 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 648.

Novarly Parcel · official public data, read properly · parcel.novarly.com