Novarly ParcelRenewable sites

Renewable sitesChapman's Well

Chapman's Well

Chapman's Well is an operational 1 MW landfill gas site in County Durham, generating since 1 March 2003. Planning permission was granted on 21 August 2002, 3 months after submission. Operator of record: Natural Power.

1 MW
Capacity
as recorded in REPD
Operational
Status
since 1 March 2003
Landfill Gas
Technology
Natural Power
County Durham
Authority
England

Planning and build timeline

Application submitted30 May 2002
Permission granted21 August 2002
3 months after submission
Operational1 March 2003
6 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in County Durham: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Chapman's Well’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
50.6 km
Wind Onshore · Operational
41.1 km
Wind Onshore · Operational
2.83.5 km
Wind Onshore · Operational
84.8 km
Anaerobic Digestion · Operational
15.3 km
Solar Photovoltaics · Under Construction
57.2 km
Solar Photovoltaics · Operational
0.387.3 km
Wind Onshore · Operational
2.49.9 km

How big is Chapman's Well?

Chapman's Well has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Chapman's Well?

REPD records the operator as Natural Power. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Chapman's Well approved and built?

The application was submitted on 30 May 2002. Permission was granted on 21 August 2002, 3 months later. The site became operational on 1 March 2003, 6 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 648.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode