Langford Wind Farm
Langford Wind Farm is an operational 20 MW onshore wind farm in Central Bedfordshire, generating since 30 January 2014. Planning permission was granted on 19 January 2012, 35 months after submission. Operator of record: Co-operative Group.
Planning and build timeline
| Application submitted | 11 February 2009 |
| Permission granted | 19 January 2012 35 months after submission |
| Operational | 30 January 2014 24 months after consent |
Screening a site of your own?
Central Bedfordshire approves 86% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Langford Wind Farm’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Central Bedfordshire’s record on onshore wind
Central Bedfordshire has decided 7 onshore wind schemes and approved 86%, taking a median of 8.6 months. See every onshore wind scheme decision in Central Bedfordshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 13 | 2.1 km |
Landfill Gas · Operational | 2.3 | 6.5 km |
Landfill Gas · Operational | 1.1 | 6.7 km |
Anaerobic Digestion · Operational | 2.3 | 9.4 km |
Landfill Gas · Operational | 1.5 | 9.8 km |
Solar Photovoltaics · Operational | 14.6 | 10.1 km |
Solar Photovoltaics · Operational | 45 | 13.4 km |
Solar Photovoltaics · Operational | 16.5 | 13.7 km |
How big is Langford Wind Farm?
Langford Wind Farm has a recorded installed capacity of 20 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Langford Wind Farm?
REPD records the operator as Co-operative Group. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Langford Wind Farm approved and built?
The application was submitted on 11 February 2009. Permission was granted on 19 January 2012, 35 months later. The site became operational on 30 January 2014, 24 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4666.