Langford Wind Farm is operational in Central Bedfordshire with a recorded capacity of 20 MW, and has been generating since 2014-01-30.

20 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-01-30
Wind Onshore
Technology
Co-operative Group
Central Bedfordshire
Authority
England

Planning and build timeline

Application submitted2009-02-11
Permission granted2012-01-19
35 months after submission
Operational2014-01-30
24 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Central Bedfordshire’s record on onshore wind

Central Bedfordshire has decided 7 onshore wind schemes and approved 86%, taking a median of 8.6 months. See every onshore wind scheme decision in Central Bedfordshire

Other built sites within 15 km

SiteMWDistance
Langford Solar Farm
Solar Photovoltaics · Operational
132.1 km
Arlesey Landfill Gas (Extension)
Landfill Gas · Operational
2.36.5 km
Arlesey Landfill Site
Landfill Gas · Operational
1.16.7 km
Bygrave Lodge Farm Anaerobic Digestion Facility (Farm AD)
Anaerobic Digestion · Operational
2.39.4 km
Hitchin
Landfill Gas · Operational
1.59.8 km
Waterloo solar park
Solar Photovoltaics · Operational
14.610.1 km
Vine Farm Solar Park
Solar Photovoltaics · Operational
4513.4 km
Croydon / Church Farm (Royston)
Solar Photovoltaics · Operational
16.513.7 km

How big is Langford Wind Farm?

Langford Wind Farm has a recorded installed capacity of 20 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Langford Wind Farm?

REPD records the operator as Co-operative Group. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Langford Wind Farm approved and built?

The application was submitted on 2009-02-11. Permission was granted on 2012-01-19, 35 months later. The site became operational on 2014-01-30, 24 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4666.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council