Renewable sites › Arlesey Landfill Gas (Extension)
Arlesey Landfill Gas (Extension)
Arlesey Landfill Gas (Extension) is operational in Central Bedfordshire with a recorded capacity of 2.3 MW, and has been generating since 2006-12-01.
Planning and build timeline
| Application submitted | 2005-06-02 |
| Permission granted | 2006-01-21 8 months after submission |
| Operational | 2006-12-01 10 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Arlesey Landfill Site Landfill Gas · Operational | 1.1 | 0.5 km |
Hitchin Landfill Gas · Operational | 1.5 | 3.5 km |
Langford Solar Farm Solar Photovoltaics · Operational | 13 | 4.3 km |
Langford Wind Farm Wind Onshore · Operational | 20 | 6.5 km |
Bygrave Lodge Farm Anaerobic Digestion Facility (Farm AD) Anaerobic Digestion · Operational | 2.3 | 8.8 km |
Flamingo House Solar Photovoltaics · Operational | 1 | 11.5 km |
Clayhill Farm Solar Photovoltaics · Operational | 10 | 14.6 km |
Clayhill Battery · Operational | 6 | 14.6 km |
How big is Arlesey Landfill Gas (Extension)?
Arlesey Landfill Gas (Extension) has a recorded installed capacity of 2.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Arlesey Landfill Gas (Extension)?
REPD records the operator as Waste Recycling Group. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Arlesey Landfill Gas (Extension) approved and built?
The application was submitted on 2005-06-02. Permission was granted on 2006-01-21, 8 months later. The site became operational on 2006-12-01, 10 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 774.
Novarly Parcel · official public data, read properly · parcel.novarly.com