Renewable sites › Langford Solar Farm
Langford Solar Farm
Langford Solar Farm is an operational 13 MW solar farm in Central Bedfordshire, generating since 31 March 2015. Planning permission was granted on 24 September 2013, 3 months after submission. Operator of record: Lark Energy.
Planning and build timeline
| Application submitted | 28 June 2013 |
| Permission granted | 24 September 2013 3 months after submission |
| Operational | 31 March 2015 18 months after consent |
Screening a site of your own?
Central Bedfordshire approves 97% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Langford Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Central Bedfordshire’s record on solar
Central Bedfordshire has decided 32 solar farms and approved 97%, taking a median of 3.2 months. See every solar farm decision in Central Bedfordshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 20 | 2.1 km |
Landfill Gas · Operational | 2.3 | 4.3 km |
Landfill Gas · Operational | 1.1 | 4.6 km |
Landfill Gas · Operational | 1.5 | 7.7 km |
Anaerobic Digestion · Operational | 2.3 | 8.7 km |
Solar Photovoltaics · Operational | 14.6 | 12.1 km |
Solar Photovoltaics · Operational | 14.4 | 14.8 km |
Solar Photovoltaics · Operational | 45 | 14.9 km |
How big is Langford Solar Farm?
Langford Solar Farm has a recorded installed capacity of 13 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Langford Solar Farm?
REPD records the operator as Lark Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Langford Solar Farm approved and built?
The application was submitted on 28 June 2013. Permission was granted on 24 September 2013, 3 months later. The site became operational on 31 March 2015, 18 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2357.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode