Renewable sites › Land South West Of Apollo Business Park
Land South West Of Apollo Business Park
Land South West Of Apollo Business Park is operational in Cherwell with a recorded capacity of 1.7 MW, and has been generating since 2014-04-15.
Planning and build timeline
| Application submitted | 2013-01-18 |
| Permission granted | 2013-04-03 2 months after submission |
| Operational | 2014-04-15 12 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Cherwell’s record on solar
Cherwell has decided 36 solar farms and approved 100%, taking a median of 2.4 months. See every solar farm decision in Cherwell →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Epwell Grounds Farm solar park Solar Photovoltaics · Operational | 7 | 3.6 km |
North Of Field Barn Solar Photovoltaics · Operational | 1 | 6.8 km |
Rickfield Farm solar park Solar Photovoltaics · Operational | 1 | 8.5 km |
Feldon Vale Solar Farm Solar Photovoltaics · Operational | 49.9 | 13.1 km |
Banbury Road, Gaydon - Solar Array Solar Photovoltaics · Operational | 18 | 13.6 km |
Boddington Reservoir Wind Onshore · Operational | 1.5 | 14.1 km |
Hill Farm Solar Photovoltaics · Operational | 5 | 14.3 km |
Culworth House Solar Farm Solar Photovoltaics · Operational | 3 | 14.9 km |
How big is Land South West Of Apollo Business Park?
Land South West Of Apollo Business Park has a recorded installed capacity of 1.7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Land South West Of Apollo Business Park?
REPD records the operator as Cyrasol Ecotec. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Land South West Of Apollo Business Park approved and built?
The application was submitted on 2013-01-18. Permission was granted on 2013-04-03, 2 months later. The site became operational on 2014-04-15, 12 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1744.