Rickfield Farm solar park is an operational 1 MW solar farm in Cherwell, generating since 1 November 2014. Planning permission was granted on 1 November 2013, 3 months after submission. Operator of record: Western Power Distribution.
Planning and build timeline
| Application submitted | 5 August 2013 |
| Permission granted | 1 November 2013 3 months after submission |
| Operational | 1 November 2014 12 months after consent |
Screening a site of your own?
Cherwell approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Rickfield Farm solar park’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Cherwell’s record on solar
Cherwell has decided 36 solar farms and approved 100%, taking a median of 2.4 months. See every solar farm decision in Cherwell →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 1 | 5.1 km |
Solar Photovoltaics · Operational | 5 | 7.2 km |
Solar Photovoltaics · Operational | 7 | 7.9 km |
Solar Photovoltaics · Operational | 1.7 | 8.5 km |
How big is Rickfield Farm solar park?
Rickfield Farm solar park has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Rickfield Farm solar park?
REPD records the operator as Western Power Distribution. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Rickfield Farm solar park approved and built?
The application was submitted on 5 August 2013. Permission was granted on 1 November 2013, 3 months later. The site became operational on 1 November 2014, 12 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1240.
Novarly Parcel · official public data, read properly · parcel.novarly.com