Land At Guston Court Farm is operational in Dover with a recorded capacity of 5 MW, and has been generating since 2015-12-20.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-12-20
Solar Photovoltaics
Technology
Conergy West Sussex
Dover
Authority
England

Planning and build timeline

Application submitted2014-12-16
Permission granted2015-03-19
3 months after submission
Operational2015-12-20
9 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Dover’s record on solar

Dover has decided 16 solar farms and approved 88%, taking a median of 3.7 months. See every solar farm decision in Dover

Other built sites within 15 km

SiteMWDistance
Chalk Pit Solar Farm
Battery · Under Construction
0.9 km
Tilmanstone Colliery
Solar Photovoltaics · Operational
107.7 km
Old Lorry Farm Shop
Solar Photovoltaics · Under Construction
9.7 km
Home Farm (Knowlton - solar)
Solar Photovoltaics · Operational
11.510.6 km
Morrisons Store 148 Cheriton Road - Solar Array
Solar Photovoltaics · Operational
0.2913.7 km
Marshborough Farm solar park
Solar Photovoltaics · Operational
514.4 km
Grain Harvesters Ltd
Solar Photovoltaics · Operational
114.8 km

How big is Land At Guston Court Farm?

Land At Guston Court Farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Land At Guston Court Farm?

REPD records the operator as Conergy West Sussex. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Land At Guston Court Farm approved and built?

The application was submitted on 2014-12-16. Permission was granted on 2015-03-19, 3 months later. The site became operational on 2015-12-20, 9 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4952.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council