Morrisons Store 148 Cheriton Road - Solar Array is operational in Folkestone and Hythe with a recorded capacity of 0.29 MW.
Planning and build timeline
| Application submitted | 2021-11-23 |
| Permission granted | 2022-03-03 3 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Folkestone and Hythe’s record on solar
Folkestone and Hythe has decided 8 solar farms and approved 100%, taking a median of 2.5 months. See every solar farm decision in Folkestone and Hythe →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Partridge Farm Solar Photovoltaics · Operational | 10.6 | 13.1 km |
Land At Guston Court Farm Solar Photovoltaics · Operational | 5 | 13.7 km |
Chalk Pit Solar Farm Battery · Under Construction | — | 14.6 km |
How big is Morrisons Store 148 Cheriton Road - Solar Array?
Morrisons Store 148 Cheriton Road - Solar Array has a recorded installed capacity of 0.29 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Morrisons Store 148 Cheriton Road - Solar Array?
REPD records the operator as WM Morrisons Supermarkets Plc. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Morrisons Store 148 Cheriton Road - Solar Array approved and built?
The application was submitted on 2021-11-23. Permission was granted on 2022-03-03, 3 months later. REPD does not record an operational date.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 10005.