Morrisons Store 148 Cheriton Road - Solar Array is operational in Folkestone and Hythe with a recorded capacity of 0.29 MW.

0.29 MW
Capacity
as recorded in REPD
Operational
Status
no operational date
Solar Photovoltaics
Technology
WM Morrisons Supermarkets Plc
Folkestone and Hythe
Authority
England

Planning and build timeline

Application submitted2021-11-23
Permission granted2022-03-03
3 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Folkestone and Hythe’s record on solar

Folkestone and Hythe has decided 8 solar farms and approved 100%, taking a median of 2.5 months. See every solar farm decision in Folkestone and Hythe

Other built sites within 15 km

SiteMWDistance
Partridge Farm
Solar Photovoltaics · Operational
10.613.1 km
Land At Guston Court Farm
Solar Photovoltaics · Operational
513.7 km
Chalk Pit Solar Farm
Battery · Under Construction
14.6 km

How big is Morrisons Store 148 Cheriton Road - Solar Array?

Morrisons Store 148 Cheriton Road - Solar Array has a recorded installed capacity of 0.29 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Morrisons Store 148 Cheriton Road - Solar Array?

REPD records the operator as WM Morrisons Supermarkets Plc. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Morrisons Store 148 Cheriton Road - Solar Array approved and built?

The application was submitted on 2021-11-23. Permission was granted on 2022-03-03, 3 months later. REPD does not record an operational date.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 10005.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council