Planning and build timeline
| Application submitted | 26 February 2013 |
| Permission granted | 3 July 2013 4 months after submission |
| Operational | 15 December 2014 17 months after consent |
Screening a site of your own?
Redline runs the record on your own boundary in County Durham: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Land Adjacent to Thomas Swan and Co Ltd.’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 4 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 0.38 | 2 km |
Solar Photovoltaics · Under Construction | 5 | 2.5 km |
Wind Onshore · Operational | 4 | 4.3 km |
Solar Photovoltaics · Operational | 5 | 5.1 km |
Landfill Gas · Operational | 1 | 5.3 km |
Wind Onshore · Operational | 12 | 7.3 km |
Wind Onshore · Operational | 6 | 7.4 km |
Wind Onshore · Operational | 2.8 | 8.8 km |
How big is Land Adjacent to Thomas Swan and Co Ltd.?
Land Adjacent to Thomas Swan and Co Ltd. has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Land Adjacent to Thomas Swan and Co Ltd.?
REPD records the operator as Hallwick Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Land Adjacent to Thomas Swan and Co Ltd. approved and built?
The application was submitted on 26 February 2013. Permission was granted on 3 July 2013, 4 months later. The site became operational on 15 December 2014, 17 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 349.