Renewable sitesLand Adjacent to Thomas Swan and Co Ltd.

Land Adjacent to Thomas Swan and Co Ltd.

Land Adjacent to Thomas Swan and Co Ltd. is an operational 1 MW anaerobic digestion plant in County Durham, generating since 15 December 2014. Planning permission was granted on 3 July 2013, 4 months after submission. Operator of record: Hallwick Energy.

1 MW
Capacity
as recorded in REPD
Operational
Status
since 15 December 2014
Anaerobic Digestion
Technology
Hallwick Energy
County Durham
Authority
England

Planning and build timeline

Application submitted26 February 2013
Permission granted3 July 2013
4 months after submission
Operational15 December 2014
17 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in County Durham: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Land Adjacent to Thomas Swan and Co Ltd.’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
0.382 km
Solar Photovoltaics · Under Construction
52.5 km
Wind Onshore · Operational
44.3 km
Solar Photovoltaics · Operational
55.1 km
Landfill Gas · Operational
15.3 km
Wind Onshore · Operational
127.3 km
Wind Onshore · Operational
67.4 km
Wind Onshore · Operational
2.88.8 km

How big is Land Adjacent to Thomas Swan and Co Ltd.?

Land Adjacent to Thomas Swan and Co Ltd. has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Land Adjacent to Thomas Swan and Co Ltd.?

REPD records the operator as Hallwick Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Land Adjacent to Thomas Swan and Co Ltd. approved and built?

The application was submitted on 26 February 2013. Permission was granted on 3 July 2013, 4 months later. The site became operational on 15 December 2014, 17 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 349.