Novarly ParcelRenewable sites

Renewable sitesHownsgill Industrial Park

Hownsgill Industrial Park

Hownsgill Industrial Park is a 5 MW solar farm under construction in County Durham. Planning permission was granted on 1 March 2016, 6 months after submission. Operator of record: Project Genesis.

5 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Project Genesis
County Durham
Authority
England

Planning and build timeline

Application submitted28 August 2015
Permission granted1 March 2016
6 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

County Durham approves 93% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Hownsgill Industrial Park’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

County Durham’s record on solar

County Durham has decided 46 solar farms and approved 93%, taking a median of 2 months. See every solar farm decision in County Durham

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
0.381.9 km
Anaerobic Digestion · Operational
12.5 km
Wind Onshore · Operational
65.6 km
Wind Onshore · Operational
46.1 km
Solar Photovoltaics · Operational
56.8 km
Wind Onshore · Operational
127 km
Landfill Gas · Operational
17.2 km
Wind Onshore · Operational
2.68.5 km

How big is Hownsgill Industrial Park?

Hownsgill Industrial Park has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Hownsgill Industrial Park?

REPD records the operator as Project Genesis. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Hownsgill Industrial Park approved and built?

The application was submitted on 28 August 2015. Permission was granted on 1 March 2016, 6 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5844.

Novarly Parcel · official public data, read properly · parcel.novarly.com