L'Field Stewartby Landfill Site
L'Field Stewartby Landfill Site is operational in Bedford with a recorded capacity of 10.7 MW, and has been generating since 1998-01-01.
Planning and build timeline
| Application submitted | 1994-03-04 |
| Permission granted | 1994-07-15 4 months after submission |
| Operational | 1998-01-01 42 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Rookery South EfW Incineration · Operational | 65 | 0.5 km |
Marston Vale Country Park Wind Turbine Wind Onshore · Operational | 1.5 | 1.9 km |
Elstow Landfill Site Landfill Gas · Operational | 1.8 | 4.3 km |
Brogborough Phase IV Landfill Gas · Operational | 11 | 5.2 km |
Brogborough Phase III Landfill Gas · Operational | 11 | 5.5 km |
Cranfield Airfield Solar Photovoltaics · Operational | 1 | 6.4 km |
Elstow Landfill Site Solar Photovoltaics · Under Construction | 5.5 | 6.9 km |
Cranfield University - Solar Farm Solar Photovoltaics · Operational | 0.44 | 7.6 km |
How big is L'Field Stewartby Landfill Site?
L'Field Stewartby Landfill Site has a recorded installed capacity of 10.7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates L'Field Stewartby Landfill Site?
REPD records the operator as Waste Recycling Group. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was L'Field Stewartby Landfill Site approved and built?
The application was submitted on 1994-03-04. Permission was granted on 1994-07-15, 4 months later. The site became operational on 1998-01-01, 42 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 524.