Elstow Landfill Site is an operational 1.8 MW landfill gas site in Bedford, generating since 8 July 1996. Planning permission was granted on 23 June 1995, 5 months after submission. Operator of record: Renewable Power Generation Ltd.

1.8 MW
Capacity
as recorded in REPD
Operational
Status
since 8 July 1996
Landfill Gas
Technology
Renewable Power Generation Ltd
Bedford
Authority
England

Planning and build timeline

Application submitted9 January 1995
Permission granted23 June 1995
5 months after submission
Operational8 July 1996
13 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Bedford: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Elstow Landfill Site’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Under Construction
5.53.2 km
Landfill Gas · Operational
10.74.3 km
EfW Incineration · Operational
654.9 km
Wind Onshore · Operational
1.56.1 km
Solar Photovoltaics · Operational
7.58.2 km
Landfill Gas · Operational
119.5 km
Landfill Gas · Operational
119.8 km
EfW Incineration · Operational
3.410 km

How big is Elstow Landfill Site?

Elstow Landfill Site has a recorded installed capacity of 1.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Elstow Landfill Site?

REPD records the operator as Renewable Power Generation Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Elstow Landfill Site approved and built?

The application was submitted on 9 January 1995. Permission was granted on 23 June 1995, 5 months later. The site became operational on 8 July 1996, 13 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 511.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode