Novarly ParcelRenewable sites

Renewable sitesKingston Farm

Kingston Farm

Kingston Farm is operational in Wiltshire with a recorded capacity of 5 MW, and has been generating since 2011-10-01.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 2011-10-01
Solar Photovoltaics
Technology
BOA Property / AEE Renewables UK
Wiltshire
Authority
England

Planning and build timeline

Application submitted2011-03-31
Permission granted2011-05-17
2 months after submission
Operational2011-10-01
5 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Wiltshire’s record on solar

Wiltshire has decided 103 solar farms and approved 93%, taking a median of 4 months. See every solar farm decision in Wiltshire

Other built sites within 15 km

SiteMWDistance
Cockhill Solar Farm
Solar Photovoltaics · Operational
202.2 km
Trowle Common
Solar Photovoltaics · Operational
52.4 km
Trowbridge Sewage Treatment Works
Sewage Sludge Digestion · Operational
1.22.8 km
Marsh Farm Hilperton
Solar Photovoltaics · Operational
9.14.1 km
Land at Poles Hole Farm
Solar Photovoltaics · Operational
6.86.3 km
Land West Side of Axe and Cleaver Lane
Solar Photovoltaics · Operational
56.5 km
Norrington Common Solar Farm
Solar Photovoltaics · Operational
106.6 km
Roundponds Farm Solar Park
Solar Photovoltaics · Operational
13.56.8 km

How big is Kingston Farm?

Kingston Farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Kingston Farm?

REPD records the operator as BOA Property / AEE Renewables UK. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Kingston Farm approved and built?

The application was submitted on 2011-03-31. Permission was granted on 2011-05-17, 2 months later. The site became operational on 2011-10-01, 5 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1165.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council