Renewable sitesLand West Side of Axe and Cleaver Lane

Land West Side of Axe and Cleaver Lane

Land West Side of Axe and Cleaver Lane is operational in Wiltshire with a recorded capacity of 5 MW, and has been generating since 2016-03-31.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-03-31
Solar Photovoltaics
Technology
Wessex Solar Energy
Wiltshire
Authority
England

Planning and build timeline

Application submitted2015-05-14
Permission granted2015-08-20
3 months after submission
Operational2016-03-31
7 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Wiltshire’s record on solar

Wiltshire has decided 103 solar farms and approved 93%, taking a median of 4 months. See every solar farm decision in Wiltshire

Other built sites within 15 km

SiteMWDistance
Brook Hall Farm
Solar Photovoltaics · Operational
4.71.3 km
Land at Poles Hole Farm
Solar Photovoltaics · Operational
6.81.4 km
Blenches Mill
Solar Photovoltaics · Operational
6.12.5 km
Westbury Landfill Scheme
Landfill Gas · Operational
1.13.6 km
Trowbridge Sewage Treatment Works
Sewage Sludge Digestion · Operational
1.24 km
Trowle Common
Solar Photovoltaics · Operational
54.1 km
Westbury (Closed) Landfill Site
Solar Photovoltaics · Operational
3.54.1 km
Cockhill Solar Farm
Solar Photovoltaics · Operational
204.5 km

How big is Land West Side of Axe and Cleaver Lane?

Land West Side of Axe and Cleaver Lane has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Land West Side of Axe and Cleaver Lane?

REPD records the operator as Wessex Solar Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Land West Side of Axe and Cleaver Lane approved and built?

The application was submitted on 2015-05-14. Permission was granted on 2015-08-20, 3 months later. The site became operational on 2016-03-31, 7 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5336.