Novarly ParcelRenewable sites

Renewable sitesKenardington Place Farm

Kenardington Place Farm

Kenardington Place Farm is operational in Ashford with a recorded capacity of 7 MW, and has been generating since 2015-03-31.

7 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-03-31
Solar Photovoltaics
Technology
Kronos Solar
Ashford
Authority
England

Planning and build timeline

Application submitted2013-10-07
Permission granted2014-09-15
11 months after submission
Operational2015-03-31
6 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Ashford’s record on solar

Ashford has decided 20 solar farms and approved 85%, taking a median of 2.3 months. See every solar farm decision in Ashford

Other built sites within 15 km

SiteMWDistance
Sycamore Farm
Solar Photovoltaics · Operational
208.9 km
Station Road - Solar Array
Solar Photovoltaics · Operational
0.1710.6 km
Little Cheyne Court Wind Farm
Wind Onshore · Operational
59.810.9 km
William Harvey Hospital
Solar Photovoltaics · Operational
0.411.5 km
Oaklands Farm
Solar Photovoltaics · Operational
6.911.9 km
Partridge Farm
Solar Photovoltaics · Operational
10.612.4 km
Former Pluckley Landfill Site
Landfill Gas · Operational
113.5 km

How big is Kenardington Place Farm?

Kenardington Place Farm has a recorded installed capacity of 7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Kenardington Place Farm?

REPD records the operator as Kronos Solar. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Kenardington Place Farm approved and built?

The application was submitted on 2013-10-07. Permission was granted on 2014-09-15, 11 months later. The site became operational on 2015-03-31, 6 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2138.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council