Novarly ParcelRenewable planning

Renewable planning SolarAshford

Solar planning in Ashford

Ashford has decided 20 solar farms and approved 85% of them, taking a median of 2.3 months to decide. Consented capacity: 31 MW. 3 applications still awaiting a decision.

85%
Approved
17 granted · 3 refused
2.3 mo
Median decision
UK 2.3 mo
31 MW
Consented
53 MW refused
3
Appeals
2 allowed on appeal

How Ashford compares

Against the 298 UK authorities with 5+ solar decisions, Ashford sits in the 15th percentile for approval rate (8 points below the England average) and the 51st percentile for speed.

Decisions by year

35Approved — 2 (2014)Refused — 1 (2014)314Approved — 1 (2015)115Approved — 1 (2019)119Approved — 1 (2020)120Approved — 2 (2022)222Approved — 5 (2023)523Approved — 2 (2024)Refused — 1 (2024)324Approved — 3 (2025)Refused — 1 (2025)425
Approved Refused

Solar decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (23)

SchemeMWStatusDecided
Balfour Beatty Rail Plant, Old Railway Works - Solar PV
Balfour Beatty Group Limited Head Office · NOT/2025/1675 · 1.2 mo to decide
0.26Application Refused2025-10-16
Warren Retail Park, J Sainsbury - Solar Panels
Ineco Energy Limited · NOT/2025/1622 · 1.4 mo to decide
0.79Awaiting Construction2025-10-16
Appledore Road, Kenardington - Solar Farm
Quintas Cleantech · PA/2025/1201
35Application Submitted2025-07-07
Premier Grocery Products, Kennington Road - Solar Panels
Premier Foods · NOT/2025/0171 · 1.2 mo to decide
2.15Awaiting Construction2025-03-06
Ashford Cold Store Ardo Shearway Limited, Ashford Road - Solar Panels
Ardo UK Limited · NOT/2025/0027 · 0.8 mo to decide
0.64Awaiting Construction2025-01-31
CCL Label, Foster Road - Solar PV Panels
CCL Label · NOT/2024/0988 · 1.6 mo to decide
0.9Awaiting Construction2024-07-16
North Court Farm, Chilham - Solar Farm
GSI North Court Limited · PA/2022/2415 · 17.8 mo to decide
44Application Refused2024-04-18
Wembdon Business Centre, Bower Road - Solar Arrays
Evegate Partnership · PA/2023/2054 · 2 mo to decide
0.2Awaiting Construction2024-01-04
John Lewis At Home, Fougeres Way - Solar Panels
InRange Limited · NOT/2023/1261 · 2.7 mo to decide
0.31Awaiting Construction2023-09-25
Ashford Cattle Market Co, Monument Way - Solar Panels
Ashford Cattle Market Company Limited · NOT/2023/1081 · 1.4 mo to decide
0.18Awaiting Construction2023-07-19
Consort Frozen Foods Limited, Wotton Road - Solar Panels
Consort Frozen Foods · NOT/2023/1007 · 1 mo to decide
0.18Awaiting Construction2023-06-30
Newtown Road - Solar Panels & Air Source Heat Pumps
Network Rail Infrastructure Limited · 22/01006/AS� · 8.6 mo to decide
0.17Awaiting Construction2023-03-13
Wyvern Way, Henwood Industrial Estate - Solar Panels
MTS Cleansing Services Limited · NOT/2023/0061 · 0.7 mo to decide
Awaiting Construction2023-02-15
The Cold Store, Swan Lane - Solar Panels
Beba Energy Uk Limited · NOT/2022/2140 · 0.9 mo to decide
0.25Awaiting Construction2022-10-05
East Stour Solar Farm
EDF Energy Renewables · 22/00668/AS
49.9Application Submitted2022-06-27
Station Road - Solar Array
Hollywood Bowl Group · 21/02100/AS · 3.4 mo to decide
0.17Operational2022-03-23
William Harvey Hospital
East Kent Hospitals University NHS Foundation Trust · 19/01008/AS · 15.2 mo to decide
0.4Operational2020-10-16
Tesco Moatfield Meadow
Push Energy · 18/01837/AS · 2.3 mo to decide
0.3Awaiting Construction2019-02-28
Partridge Farm
Eco Energy World · 14/00398/AS · 17.3 mo to decide
10.6Operational2015-10-06
Kenardington Place Farm
Kronos Solar · 13/01074/AS · 11.3 mo to decide
7Operational2014-09-15
Oaklands Farm
Lightsource Renewable Energy · 14/00326/AS · 2.9 mo to decide
6.9Operational2014-06-20
Land South of Dowle Street
Sunsave 8 (Pluckley) Limited · 13/00789/AS · 6.9 mo to decide
9Appeal Refused2014-02-26
Oaklands Farm
Pegasus Group · 13/01022/AS · 3.4 mo to decide
11.4Revised2013-12-23

Does Ashford approve solar farms?

Yes — of the 20 solar farms Ashford has decided, 85% were approved (17 granted, 3 refused). The UK-wide rate for solar is 93%.

How long does a solar farm application take in Ashford?

The median time from application to decision is 2.3 months, against a UK median of 2.3 months for solar. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much solar capacity has Ashford consented?

31 MW has been consented across 17 approved schemes, with 53 MW refused. A further 3 applications awaits a decision.

Other technologies in Ashford

Battery storage in AshfordOnshore wind in Ashford

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.