Station Road - Solar Array
Station Road - Solar Array is an operational 0.17 MW solar farm in Ashford. Planning permission was granted on 23 March 2022, 3 months after submission. Operator of record: Hollywood Bowl Group.
Planning and build timeline
| Application submitted | 8 December 2021 |
| Permission granted | 23 March 2022 3 months after submission |
| Operational | not recorded |
Screening a site of your own?
Ashford approves 85% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Station Road - Solar Array’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
- Nutrient-neutrality catchment — Stodmarsh SAC/SPA/Ramsar
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Ashford’s record on solar
Ashford has decided 20 solar farms and approved 85%, taking a median of 2.3 months. See every solar farm decision in Ashford →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 0.4 | 2.9 km |
Solar Photovoltaics · Operational | 6.9 | 5.3 km |
Solar Photovoltaics · Operational | 10.6 | 8.7 km |
Landfill Gas · Operational | 1 | 9 km |
Solar Photovoltaics · Operational | 7 | 10.6 km |
Solar Photovoltaics · Operational | 6.6 | 14.5 km |
How big is Station Road - Solar Array?
Station Road - Solar Array has a recorded installed capacity of 0.17 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Station Road - Solar Array?
REPD records the operator as Hollywood Bowl Group. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Station Road - Solar Array approved and built?
The application was submitted on 8 December 2021. Permission was granted on 23 March 2022, 3 months later. REPD does not record an operational date.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 10296.