Station Road - Solar Array

Station Road - Solar Array is operational in Ashford with a recorded capacity of 0.17 MW.

0.17 MW
Capacity
as recorded in REPD
Operational
Status
no operational date
Solar Photovoltaics
Technology
Hollywood Bowl Group
Ashford
Authority
England

Planning and build timeline

Application submitted2021-12-08
Permission granted2022-03-23
3 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Ashford’s record on solar

Ashford has decided 20 solar farms and approved 85%, taking a median of 2.3 months. See every solar farm decision in Ashford

Other built sites within 15 km

SiteMWDistance
William Harvey Hospital
Solar Photovoltaics · Operational
0.42.9 km
Oaklands Farm
Solar Photovoltaics · Operational
6.95.3 km
Partridge Farm
Solar Photovoltaics · Operational
10.68.7 km
Former Pluckley Landfill Site
Landfill Gas · Operational
19 km
Kenardington Place Farm
Solar Photovoltaics · Operational
710.6 km
East Lenham Solar Farm
Solar Photovoltaics · Operational
6.614.5 km

How big is Station Road - Solar Array?

Station Road - Solar Array has a recorded installed capacity of 0.17 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Station Road - Solar Array?

REPD records the operator as Hollywood Bowl Group. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Station Road - Solar Array approved and built?

The application was submitted on 2021-12-08. Permission was granted on 2022-03-23, 3 months later. REPD does not record an operational date.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 10296.