Renewable sites › Little Cheyne Court Wind Farm
Little Cheyne Court Wind Farm
Little Cheyne Court Wind Farm is an operational 59.8 MW onshore wind farm in Folkestone and Hythe, generating since 1 June 2009. Planning permission was granted on 18 October 2005, 35 months after submission. Operator of record: RWE npower.
Planning and build timeline
| Application submitted | 28 November 2002 |
| Permission granted | 18 October 2005 35 months after submission |
| Operational | 1 June 2009 43 months after consent |
Screening a site of your own?
Redline runs the record on your own boundary in Folkestone and Hythe: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Little Cheyne Court Wind Farm’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 1 agricultural land.
- SSSI — Dungeness, Romney Marsh and Rye Bay SSSI
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 20 | 4.9 km |
Solar Photovoltaics · Operational | 1 | 6.9 km |
Solar Photovoltaics · Operational | 7 | 10.9 km |
How big is Little Cheyne Court Wind Farm?
Little Cheyne Court Wind Farm has a recorded installed capacity of 59.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Little Cheyne Court Wind Farm?
REPD records the operator as RWE npower. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Little Cheyne Court Wind Farm approved and built?
The application was submitted on 28 November 2002. Permission was granted on 18 October 2005, 35 months later. The site became operational on 1 June 2009, 43 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3096.