Renewable sitesFormer Pluckley Landfill Site

Former Pluckley Landfill Site

Former Pluckley Landfill Site is operational in Ashford with a recorded capacity of 1 MW, and has been generating since 2002-12-01.

1 MW
Capacity
as recorded in REPD
Operational
Status
since 2002-12-01
Landfill Gas
Technology
Farley Engineering/ Kent Weald Properties/Cleanaway
Ashford
Authority
England

Planning and build timeline

Application submitted2001-12-13
Permission granted2002-02-14
2 months after submission
Operational2002-12-01
10 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Oaklands Farm
Solar Photovoltaics · Operational
6.93.8 km
East Lenham Solar Farm
Solar Photovoltaics · Operational
6.66.4 km
Station Road - Solar Array
Solar Photovoltaics · Operational
0.179 km
William Harvey Hospital
Solar Photovoltaics · Operational
0.411.9 km
Kenardington Place Farm
Solar Photovoltaics · Operational
713.5 km
Knoxbridge Farm
Anaerobic Digestion · Under Construction
214 km

How big is Former Pluckley Landfill Site?

Former Pluckley Landfill Site has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Former Pluckley Landfill Site?

REPD records the operator as Farley Engineering/ Kent Weald Properties/Cleanaway. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Former Pluckley Landfill Site approved and built?

The application was submitted on 2001-12-13. Permission was granted on 2002-02-14, 2 months later. The site became operational on 2002-12-01, 10 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 650.