Sycamore Farm

Sycamore Farm is operational in Folkestone and Hythe with a recorded capacity of 20 MW, and has been generating since 2014-05-30.

20 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-05-30
Solar Photovoltaics
Technology
BNRG Renewables
Folkestone and Hythe
Authority
England

Planning and build timeline

Application submitted2012-10-08
Permission granted2013-01-17
3 months after submission
Operational2014-05-30
16 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Folkestone and Hythe’s record on solar

Folkestone and Hythe has decided 8 solar farms and approved 100%, taking a median of 2.5 months. See every solar farm decision in Folkestone and Hythe

Other built sites within 15 km

SiteMWDistance
Little Cheyne Court Wind Farm
Wind Onshore · Operational
59.84.9 km
Dengemarsh Road
Solar Photovoltaics · Operational
16.8 km
Kenardington Place Farm
Solar Photovoltaics · Operational
78.9 km
Partridge Farm
Solar Photovoltaics · Operational
10.614.1 km

How big is Sycamore Farm?

Sycamore Farm has a recorded installed capacity of 20 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Sycamore Farm?

REPD records the operator as BNRG Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Sycamore Farm approved and built?

The application was submitted on 2012-10-08. Permission was granted on 2013-01-17, 3 months later. The site became operational on 2014-05-30, 16 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1775.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council