Partridge Farm
Partridge Farm is an operational 10.6 MW solar farm in Ashford, generating since 24 March 2016. Planning permission was granted on 6 October 2015, 17 months after submission. Operator of record: Eco Energy World.
Planning and build timeline
| Application submitted | 28 April 2014 |
| Permission granted | 6 October 2015 17 months after submission |
| Operational | 24 March 2016 6 months after consent |
Screening a site of your own?
Ashford approves 85% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Partridge Farm’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- Nutrient-neutrality catchment — Stodmarsh SAC/SPA/Ramsar
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Ashford’s record on solar
Ashford has decided 20 solar farms and approved 85%, taking a median of 2.3 months. See every solar farm decision in Ashford →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 0.4 | 6.1 km |
Solar Photovoltaics · Operational | 0.17 | 8.7 km |
Solar Photovoltaics · Operational | 7 | 12.4 km |
Solar Photovoltaics · Operational | 0.29 | 13.1 km |
Solar Photovoltaics · Operational | 6.9 | 13.9 km |
Solar Photovoltaics · Operational | 20 | 14.1 km |
How big is Partridge Farm?
Partridge Farm has a recorded installed capacity of 10.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Partridge Farm?
REPD records the operator as Eco Energy World. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Partridge Farm approved and built?
The application was submitted on 28 April 2014. Permission was granted on 6 October 2015, 17 months later. The site became operational on 24 March 2016, 6 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2006.