Partridge Farm is an operational 10.6 MW solar farm in Ashford, generating since 24 March 2016. Planning permission was granted on 6 October 2015, 17 months after submission. Operator of record: Eco Energy World.

10.6 MW
Capacity
as recorded in REPD
Operational
Status
since 24 March 2016
Solar Photovoltaics
Technology
Eco Energy World
Ashford
Authority
England

Planning and build timeline

Application submitted28 April 2014
Permission granted6 October 2015
17 months after submission
Operational24 March 2016
6 months after consent

Screening a site of your own?

RedlineUK · £39

Ashford approves 85% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Partridge Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Ashford’s record on solar

Ashford has decided 20 solar farms and approved 85%, taking a median of 2.3 months. See every solar farm decision in Ashford

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
0.46.1 km
Solar Photovoltaics · Operational
0.178.7 km
Solar Photovoltaics · Operational
712.4 km
Solar Photovoltaics · Operational
0.2913.1 km
Solar Photovoltaics · Operational
6.913.9 km
Solar Photovoltaics · Operational
2014.1 km

How big is Partridge Farm?

Partridge Farm has a recorded installed capacity of 10.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Partridge Farm?

REPD records the operator as Eco Energy World. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Partridge Farm approved and built?

The application was submitted on 28 April 2014. Permission was granted on 6 October 2015, 17 months later. The site became operational on 24 March 2016, 6 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2006.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode