Partridge Farm is operational in Ashford with a recorded capacity of 10.6 MW, and has been generating since 2016-03-24.

10.6 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-03-24
Solar Photovoltaics
Technology
Eco Energy World
Ashford
Authority
England

Planning and build timeline

Application submitted2014-04-28
Permission granted2015-10-06
17 months after submission
Operational2016-03-24
6 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Ashford’s record on solar

Ashford has decided 20 solar farms and approved 85%, taking a median of 2.3 months. See every solar farm decision in Ashford

Other built sites within 15 km

SiteMWDistance
William Harvey Hospital
Solar Photovoltaics · Operational
0.46.1 km
Station Road - Solar Array
Solar Photovoltaics · Operational
0.178.7 km
Kenardington Place Farm
Solar Photovoltaics · Operational
712.4 km
Morrisons Store 148 Cheriton Road - Solar Array
Solar Photovoltaics · Operational
0.2913.1 km
Oaklands Farm
Solar Photovoltaics · Operational
6.913.9 km
Sycamore Farm
Solar Photovoltaics · Operational
2014.1 km

How big is Partridge Farm?

Partridge Farm has a recorded installed capacity of 10.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Partridge Farm?

REPD records the operator as Eco Energy World. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Partridge Farm approved and built?

The application was submitted on 2014-04-28. Permission was granted on 2015-10-06, 17 months later. The site became operational on 2016-03-24, 6 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2006.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council