Renewable sites › Jaywick Water Recycling Centre
Jaywick Water Recycling Centre
Jaywick Water Recycling Centre is operational in Tendring with a recorded capacity of 0.9 MW, and has been generating since 2019-12-16.
Planning and build timeline
| Application submitted | 2017-11-24 |
| Permission granted | not recorded |
| Operational | 2019-12-16 |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Tendring’s record on solar
Tendring has decided 18 solar farms and approved 83%, taking a median of 3 months. See every solar farm decision in Tendring →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Earl's Hall Wind Onshore · Operational | 10.3 | 2.7 km |
Chisbon Solar Farm (Frowick Lane) Solar Photovoltaics · Operational | 13 | 4.3 km |
Gunfleet Sands Offshore Wind Scheme Wind Offshore · Operational | 108 | 9.8 km |
Bluegates Solar Park Solar Photovoltaics · Operational | 10.5 | 10.9 km |
Gunfleet Sands - (Demo) Extension Wind Offshore · Operational | 12 | 10.9 km |
Blue Gates Farm Wind Onshore · Operational | 1.5 | 11.1 km |
Gunfleet Sands II� Wind Offshore · Operational | 64.8 | 11.6 km |
Langenhoe Solar Farm Solar Photovoltaics · Operational | 21.3 | 12.1 km |
How big is Jaywick Water Recycling Centre?
Jaywick Water Recycling Centre has a recorded installed capacity of 0.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Jaywick Water Recycling Centre?
REPD records the operator as Anglian Water. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Jaywick Water Recycling Centre approved and built?
The application was submitted on 2017-11-24. REPD does not record a grant date. The site became operational on 2019-12-16.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7689.
Novarly Parcel · official public data, read properly · parcel.novarly.com