Novarly ParcelRenewable sites

Renewable sitesJaywick Water Recycling Centre

Jaywick Water Recycling Centre

Jaywick Water Recycling Centre is operational in Tendring with a recorded capacity of 0.9 MW, and has been generating since 2019-12-16.

0.9 MW
Capacity
as recorded in REPD
Operational
Status
since 2019-12-16
Solar Photovoltaics
Technology
Anglian Water
Tendring
Authority
England

Planning and build timeline

Application submitted2017-11-24
Permission grantednot recorded
Operational2019-12-16

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Tendring’s record on solar

Tendring has decided 18 solar farms and approved 83%, taking a median of 3 months. See every solar farm decision in Tendring

Other built sites within 15 km

SiteMWDistance
Earl's Hall
Wind Onshore · Operational
10.32.7 km
Chisbon Solar Farm (Frowick Lane)
Solar Photovoltaics · Operational
134.3 km
Gunfleet Sands Offshore Wind Scheme
Wind Offshore · Operational
1089.8 km
Bluegates Solar Park
Solar Photovoltaics · Operational
10.510.9 km
Gunfleet Sands - (Demo) Extension
Wind Offshore · Operational
1210.9 km
Blue Gates Farm
Wind Onshore · Operational
1.511.1 km
Gunfleet Sands II�
Wind Offshore · Operational
64.811.6 km
Langenhoe Solar Farm
Solar Photovoltaics · Operational
21.312.1 km

How big is Jaywick Water Recycling Centre?

Jaywick Water Recycling Centre has a recorded installed capacity of 0.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Jaywick Water Recycling Centre?

REPD records the operator as Anglian Water. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Jaywick Water Recycling Centre approved and built?

The application was submitted on 2017-11-24. REPD does not record a grant date. The site became operational on 2019-12-16.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7689.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council