Novarly ParcelRenewable sites

Renewable sitesJaywick Water Recycling Centre

Jaywick Water Recycling Centre

Jaywick Water Recycling Centre is an operational 0.9 MW solar farm in Tendring, generating since 16 December 2019. REPD does not record the planning grant date. Operator of record: Anglian Water.

0.9 MW
Capacity
as recorded in REPD
Operational
Status
since 16 December 2019
Solar Photovoltaics
Technology
Anglian Water
Tendring
Authority
England

Planning and build timeline

Application submitted24 November 2017
Permission grantednot recorded
Operational16 December 2019

Screening a site of your own?

RedlineUK · £39

Tendring approves 83% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Jaywick Water Recycling Centre’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Tendring’s record on solar

Tendring has decided 18 solar farms and approved 83%, taking a median of 3 months. See every solar farm decision in Tendring

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
10.32.7 km
Solar Photovoltaics · Operational
134.3 km
Wind Offshore · Operational
1089.8 km
Solar Photovoltaics · Operational
10.510.9 km
Wind Offshore · Operational
1210.9 km
Wind Onshore · Operational
1.511.1 km
Wind Offshore · Operational
64.811.6 km
Solar Photovoltaics · Operational
21.312.1 km

How big is Jaywick Water Recycling Centre?

Jaywick Water Recycling Centre has a recorded installed capacity of 0.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Jaywick Water Recycling Centre?

REPD records the operator as Anglian Water. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Jaywick Water Recycling Centre approved and built?

The application was submitted on 24 November 2017. REPD does not record a grant date. The site became operational on 16 December 2019.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7689.