Blue Gates Farm is operational in Tendring with a recorded capacity of 1.5 MW, and has been generating since 2010-03-01.

1.5 MW
Capacity
as recorded in REPD
Operational
Status
since 2010-03-01
Wind Onshore
Technology
M H Leyland Ltd
Tendring
Authority
England

Planning and build timeline

Application submitted2009-06-05
Permission granted2009-09-11
3 months after submission
Operational2010-03-01
6 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Bluegates Solar Park
Solar Photovoltaics · Operational
10.50.3 km
Colchester STW
Sewage Sludge Digestion · Operational
1.25.1 km
Chancery Farm (Ardleigh)
Solar Photovoltaics · Operational
11.95.3 km
Langenhoe Solar Farm
Solar Photovoltaics · Operational
21.37.2 km
Chisbon Solar Farm (Frowick Lane)
Solar Photovoltaics · Operational
137.3 km
Earl's Hall
Wind Onshore · Operational
10.39.5 km
Wix Lodge
Solar Photovoltaics · Operational
18.79.9 km
Boxted Airfield
Solar Photovoltaics · Operational
18.810.3 km

How big is Blue Gates Farm?

Blue Gates Farm has a recorded installed capacity of 1.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Blue Gates Farm?

REPD records the operator as M H Leyland Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Blue Gates Farm approved and built?

The application was submitted on 2009-06-05. Permission was granted on 2009-09-11, 3 months later. The site became operational on 2010-03-01, 6 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2694.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council