Gunfleet Sands - (Demo) Extension

Gunfleet Sands - (Demo) Extension is operational in DECC (S36) with a recorded capacity of 12 MW, and has been generating since 2013-04-19.

12 MW
Capacity
as recorded in REPD
Operational
Status
since 2013-04-19
Wind Offshore
Technology
Orsted (formerly Dong Energy)
DECC (S36)
Authority
England

Planning and build timeline

Application submittednot recorded
Permission granted2012-04-17
Operational2013-04-19
12 months after consent

What this site sits on

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Gunfleet Sands Offshore Wind Scheme
Wind Offshore · Operational
1083.6 km
Gunfleet Sands II�
Wind Offshore · Operational
64.84.6 km
Jaywick Water Recycling Centre
Solar Photovoltaics · Operational
0.910.9 km
Earl's Hall
Wind Onshore · Operational
10.313.1 km

How big is Gunfleet Sands - (Demo) Extension?

Gunfleet Sands - (Demo) Extension has a recorded installed capacity of 12 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Gunfleet Sands - (Demo) Extension?

REPD records the operator as Orsted (formerly Dong Energy). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Gunfleet Sands - (Demo) Extension approved and built?

REPD does not record a submission date. Permission was granted on 2012-04-17. The site became operational on 2013-04-19, 12 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2488.