Langenhoe Solar Farm is operational in Colchester with a recorded capacity of 21.3 MW, and has been generating since 2015-03-04.

21.3 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-03-04
Solar Photovoltaics
Technology
NextEnergy Solar Fund
Colchester
Authority
England

Planning and build timeline

Application submitted2013-11-22
Permission granted2014-08-29
9 months after submission
Operational2015-03-04
6 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Colchester’s record on solar

Colchester has decided 19 solar farms and approved 95%, taking a median of 3 months. See every solar farm decision in Colchester

Other built sites within 15 km

SiteMWDistance
Colchester STW
Sewage Sludge Digestion · Operational
1.26.9 km
Bluegates Solar Park
Solar Photovoltaics · Operational
10.57 km
Blue Gates Farm
Wind Onshore · Operational
1.57.2 km
Layer Farm - Solar Farm
Solar Photovoltaics · Operational
497.2 km
Bellhouse South
Landfill Gas · Operational
3.99.3 km
Land Adjacent Claypits Farm (a)
Solar Photovoltaics · Operational
59.7 km
Land Adjacent Claypits Farm (b) (Birch Estate)
Solar Photovoltaics · Operational
2.39.7 km
Chisbon Solar Farm (Frowick Lane)
Solar Photovoltaics · Operational
1310.4 km

How big is Langenhoe Solar Farm?

Langenhoe Solar Farm has a recorded installed capacity of 21.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Langenhoe Solar Farm?

REPD records the operator as NextEnergy Solar Fund. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Langenhoe Solar Farm approved and built?

The application was submitted on 2013-11-22. Permission was granted on 2014-08-29, 9 months later. The site became operational on 2015-03-04, 6 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1463.