Iron Mountain Building

Iron Mountain Building is an operational 0.3 MW solar farm in West Lothian, generating since 1 March 2020. Planning permission was granted on 2 April 2019, 1 months after submission. Operator of record: Iron Mountain.

0.3 MW
Capacity
as recorded in REPD
Operational
Status
since 1 March 2020
Solar Photovoltaics
Technology
Iron Mountain
West Lothian
Authority
Scotland

Planning and build timeline

Application submitted21 February 2019
Permission granted2 April 2019
1 months after submission
Operational1 March 2020
11 months after consent

Screening a site of your own?

RedlineUK · £39

West Lothian approves 94% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Iron Mountain Building’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

West Lothian’s record on solar

West Lothian has decided 16 solar farms and approved 94%, taking a median of 2.2 months. See every solar farm decision in West Lothian

Other built sites within 15 km

SiteMWDistance
Battery · Operational
204 km
Solar Photovoltaics · Operational
0.27.1 km
Landfill Gas · Operational
2.48.4 km
Solar Photovoltaics · Operational
1.39 km
Wind Onshore · Operational
19.210.8 km
Wind Onshore · Operational
51.711.8 km
Wind Onshore · Operational
1412.4 km
Advanced Conversion Technologies · Operational
213.1 km

How big is Iron Mountain Building?

Iron Mountain Building has a recorded installed capacity of 0.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Iron Mountain Building?

REPD records the operator as Iron Mountain. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Iron Mountain Building approved and built?

The application was submitted on 21 February 2019. Permission was granted on 2 April 2019, 1 months later. The site became operational on 1 March 2020, 11 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7259.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode