Novarly ParcelRenewable sites

Renewable sitesClaylands Road

Claylands Road

Claylands Road is an operational 0.2 MW solar farm in City of Edinburgh, generating since 1 January 2022. Planning permission was granted on 1 July 2020, 4 months after submission. Operator of record: Scottish Fire and Rescue Service.

0.2 MW
Capacity
as recorded in REPD
Operational
Status
since 1 January 2022
Solar Photovoltaics
Technology
Scottish Fire and Rescue Service
City of Edinburgh
Authority
Scotland

Planning and build timeline

Application submitted26 February 2020
Permission granted1 July 2020
4 months after submission
Operational1 January 2022
18 months after consent

Screening a site of your own?

RedlineUK · £39

City of Edinburgh approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Claylands Road’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

City of Edinburgh’s record on solar

City of Edinburgh has decided 14 solar farms and approved 100%, taking a median of 1.9 months. See every solar farm decision in City of Edinburgh

Other built sites within 15 km

SiteMWDistance
Battery · Operational
203.2 km
Landfill Gas · Operational
2.45.3 km
Solar Photovoltaics · Operational
0.37.1 km
Solar Photovoltaics · Operational
0.29.9 km
Wind Onshore · Operational
1.513.9 km
Wind Onshore · Operational
1.514.2 km
Solar Photovoltaics · Operational
0.214.3 km
Solar Photovoltaics · Operational
1.914.9 km

How big is Claylands Road?

Claylands Road has a recorded installed capacity of 0.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Claylands Road?

REPD records the operator as Scottish Fire and Rescue Service. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Claylands Road approved and built?

The application was submitted on 26 February 2020. Permission was granted on 1 July 2020, 4 months later. The site became operational on 1 January 2022, 18 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7763.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode