Novarly ParcelRenewable sites

Renewable sitesHutton Battery Storage (Lower Road)

Hutton Battery Storage (Lower Road)

Hutton Battery Storage (Lower Road) is operational in Brentwood with a recorded capacity of 10 MW, and has been generating since 2020-04-01.

10 MW
Capacity
as recorded in REPD
Operational
Status
since 2020-04-01
Battery
Technology
Gore Street Capital / Flexitricity Limited
Brentwood
Authority
England

Planning and build timeline

Application submitted2017-09-29
Permission granted2017-12-15
3 months after submission
Operational2020-04-01
28 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Crouch Solar Farm
Battery · Operational
49.95.5 km
Crouch Solar Farm
Solar Photovoltaics · Operational
49.95.5 km
Outwood Farm (Phase 1)
Solar Photovoltaics · Operational
56.4 km
Ford Research And Engineering Centre, Dunton - Solar Farm
Solar Photovoltaics · Operational
5.27.1 km
Crays Hall Farm - Solar Arrays
Solar Photovoltaics · Under Construction
25.68.2 km
Lower Dunton Road Battery Storage Facility
Battery · Operational
288.3 km
Fairwind Farm
Solar Photovoltaics · Operational
108.5 km
Ongar Landfill Scheme
Landfill Gas · Operational
19.5 km

How big is Hutton Battery Storage (Lower Road)?

Hutton Battery Storage (Lower Road) has a recorded installed capacity of 10 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Hutton Battery Storage (Lower Road)?

REPD records the operator as Gore Street Capital / Flexitricity Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Hutton Battery Storage (Lower Road) approved and built?

The application was submitted on 2017-09-29. Permission was granted on 2017-12-15, 3 months later. The site became operational on 2020-04-01, 28 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 20396.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council