Novarly ParcelRenewable sites

Renewable sitesHutton Battery Storage (Lower Road)

Hutton Battery Storage (Lower Road)

Hutton Battery Storage (Lower Road) is an operational 10 MW battery storage site in Brentwood, generating since 1 April 2020. Planning permission was granted on 15 December 2017, 3 months after submission. Operator of record: Gore Street Capital / Flexitricity Limited.

10 MW
Capacity
as recorded in REPD
Operational
Status
since 1 April 2020
Battery
Technology
Gore Street Capital / Flexitricity Limited
Brentwood
Authority
England

Planning and build timeline

Application submitted29 September 2017
Permission granted15 December 2017
3 months after submission
Operational1 April 2020
28 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Brentwood: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Hutton Battery Storage (Lower Road)’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented battery storage scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
49.95.5 km
Battery · Operational
49.95.5 km
Solar Photovoltaics · Operational
56.4 km
Solar Photovoltaics · Operational
5.27.1 km
Solar Photovoltaics · Under Construction
25.68.2 km
Battery · Operational
288.3 km
Solar Photovoltaics · Operational
108.5 km
Landfill Gas · Operational
19.5 km

How big is Hutton Battery Storage (Lower Road)?

Hutton Battery Storage (Lower Road) has a recorded installed capacity of 10 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Hutton Battery Storage (Lower Road)?

REPD records the operator as Gore Street Capital / Flexitricity Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Hutton Battery Storage (Lower Road) approved and built?

The application was submitted on 29 September 2017. Permission was granted on 15 December 2017, 3 months later. The site became operational on 1 April 2020, 28 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 20396.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode